RPO and RTO are key metrics in contingency planning: the recovery point objective defines the maximum permissible data loss, and the recovery time objective defines the required recovery time from the moment an emergency is declared. The RTO is derived from the maximum tolerable period of disruption (MTPD) of the business process and must be shorter than it.

October 13, 2026BackupEmergency PlanningBusiness Continuity

The statement that a backup exists says little about a company's resilience. What matters is how much data may be lost in an emergency, how long a business process may be down at most, and how quickly the emergency solution must be up and running afterward. RPO, RTO, and the maximum tolerable period of disruption translate these requirements into measurable targets for backup, replication, and recovery. They are a foundation for disaster recovery and business continuity management. The terms here follow BSI Standard 200-4 (the business continuity management standard of Germany's Federal Office for Information Security).

Three metrics, three questions

Why the RTO must be shorter than the MTPD

The MTPD clock starts at the outage, the RTO clock only when the emergency is declared. In between lies the response time: the outage must be detected, reported, and classified, and the emergency declared. This time does not count toward the RTO but uses up part of the MTPD. BSI Standard 200-4 therefore requires that the RTO be strictly shorter than the MTPD, subtracts the response time from the MTPD, and additionally recommends a time buffer, because detection in particular is uncertain.

A worked example: if order intake may be down for at most 24 hours and the company, based on experience, needs up to 4 hours to detect an outage and declare the emergency, at most 20 hours remain for recovery. With a buffer, the RTO is set below that, for example at 16 hours. The system that order intake needs must be running again by then; its RTO must therefore not be longer.

Target and actual: RTA and RPA

RTO and RPO are target values. Whether they are achievable is shown by comparison with the values actually achievable: the recovery time actual (RTA, actual recovery time) describes how long it really takes from the declaration of the emergency to a productive emergency solution, and the recovery point actual (RPA) the data loss actually to be expected. The requirement is met if the RTA is at most as long as the RTO and the required level of emergency operation is achieved. This can be measured reliably in recovery and restore tests, for example with the restore test log.

Typical examples

What companies should keep in mind

Norms and standards

BSI Standard 200-4 (Business Continuity Management) describes MTPD, RTO, and RPO in the chapter on business impact analysis and defines them in the accompanying glossary. According to the BSI, the standard is compatible with ISO 22301:2019 and additionally cites ISO 22317 for the business impact analysis. The BSI standard itself is available for free download from the BSI.

How TOMORIS relates

Within TOMORIS GRID, GRID.vault covers backup and recovery.